Project 1: State Route 16 between County Road 78a and County Road 80 Motorists can expect one-way traffic control from 5 a.m. to 8 p.m. Monday, Jan. 6 through Thursday, Jan. 9 and 5 a.m. to Noon on Friday, Jan. 10 for roadway excavation. Project 2: State Route 16 between County Road 21a and the Interstate 505 junction Motorists can expect one-way traffic control from 5 a.m. to 8 p.m. Monday, Jan. 6 through Thursday, Jan. 9 and 5 a.m. to Noon on Friday, Jan. 10 for roadway excavation. Unexpected schedule changes may occur. For current information on roadwork, delays, road conditions and emergency closures, call the voice-activated Caltrans Highway Information Network (CHIN) at 1-800-427-7623 (ROAD) or visit Caltrans’ “QuickMap” website at: http://quickmap.dot.ca.gov. Get the latest traffic conditions on the Winters Express Traffic page, powered by Waze, at https://www.wintersexpress.com/traffic.]]>
One-way traffic control planned for State Route 16 this week
State Route 16 is scheduled for two traffic control projects Jan. 6-10.