Expect some delays on County Road 31 starting Monday, July 22

Construction of a left-turn lane at the Indian Health Services Sacred Oaks Healing Center could cause occasional delays of up to 15 minutes from Monday, July 22 to Friday, Aug. 16.
Graphic: Winters Express
Graphic: Winters Express

Support Local Journalism

LOGIN
REGISTER

In accordance with Yolo County’s encroachment permit conditions that require safe ingress to the Indian Health Services Sacred Oaks Healing Center, currently under construction on County Road 31 east of Winters, Genesis Design and Development, with Granite Construction as their subcontractor, will be constructing a left-turn lane on County Road 31 starting on Monday, July 22.

The construction will occur within a 1,500-foot length of road, located just east of 33250 County Road 31.  The road will remain open with two lane traffic control until the expected completion of the project on Friday, Aug. 16.  Some construction methods will require temporary one lane traffic control with delays up to 15 minutes.

Access to residents and properties will be maintained during the construction.  For more information, contact Antonina Rivera with Genesis Design and Development at 316-293-6559 or riveraantonina@gmail.com.

]]>

Total
1
Shares
Leave a Reply

Your email address will not be published.

Previous Article
Graphic: Winters Express

Express Recap: City Council (July 16, 2019)

Next Article

Warrant Subject Identified

Related Posts